National Physical Laboratory (NPL)
Division: Leader NSD and Leader SSD
Start Date: July 2017
Leader Systems are pleased to announce that they have been appointed as life safety systems specialist at the National Physical Laboratory (NPL) Teddington. The project includes the installation of 26 new combined fire and PAVA systems across the site and linking them to form one complete fibre optic network controllable from a central position.
This retrofit project is using predominately existing fire alarm system infrastructure but with the replacement of all existing hardware including in excess of 6000 Apollo Discovery detectors.