London Dock
Division: Leader NSD
Start Date: July 2019
Leader Systems are pleased to confirm that they have secured Block C1 of the London Dock development in Wapping having already completed Block D and Times House.
The life safety system being installed will be a continuation of the combined Advanced and Apollo Discovery system installed into the original two blocks.
