London Dock

Division: Leader NSD

Start Date: July 2019

Leader Systems are pleased to confirm that they have secured Block C1 of the London Dock development in Wapping having already completed Block D and Times House. 

The life safety system being installed will be a continuation of the combined Advanced and Apollo Discovery system installed into the original two blocks.