Izak Walton Hotel Project

Leader Systems Maintenance and Special Projects (MSP) have successfully completed the £30k retrofit installation of a new fire detection and alarm system into the Izaak Walton Hotel in Dovedale.

The Leader MSP team were called in when the existing fire alarm system failed and a replacement was required immediately.

To ensure that the 3 week replacement programme could be met an EMS wireless system was used enabling the existing fire alarm infrastructure to be reused. This ensured that the new system was operational as soon the first device was installed, kept interruption to hotel operations to an absolute minimum and reduced the requirement for making good.

The project which included several hundred wireless devices was installed and commissioned 1 week ahead of the 3 week schedule.