Day: February 18, 2020

Vine Street London

Vine Street London Division: Leader NSD Start Date: October 2019 Leader Systems are delighted to confirm that they have been appointed to provide the life safety systems for the new mixed-use student accommodation development in Vine Street London. Incorporated into the site is a two level basement containing the exposed remains of the Roman City …

Vine Street London Read More »

British Museum Archives

British Museum Archives Division: Leader NSD Start Date: September 2019 Leader Systems are delighted to confirm that they have been appointed to provide the life safety systems for the new British Museum Archaeological Research Collection Building being constructed in Reading. This state-of-the-art facility made up of 3 interconnected blocks will be protected with a networked …

British Museum Archives Read More »