Fire Protection Specialists
sales@leader-systems.co.uk
Fire Protection Specialists
sales@leader-systems.co.uk
News
  • Raddison Blu Hotel Edinburgh

    25 August 2015

    Leader Systems Special Projects have secured the order to replace and upgrade the fire alarm system in the impressive Raddison Blu Edinburgh.
  • Cartwright Gardens Students Accommodation

    12 August 2015

    Leader Systems NBI have secured the order to design and install the Life Safety Systems at the new Cartwright Gardens Students Accommodation for London University.
  • Holy Trinity School Kidderminster

    05 August 2015

    Leader Systems Special Projects have secured a multiphase order to replace the fire detection system at historic Holy Trinity School in Kidderminster.
  • Project Vista London

    01 August 2015

    Leader Systems NBI are pleased to confirm they have been successful in securing the Life Safety Systems order for the stunning new Project Vista Development in London.
  • Thunderbird 2

    07 July 2015

    Leader Systems NBI have been appointed to design and install the fire detection and alarm system in the truly immense Project Thunderbird 2 at Kettering Northants.
  • Cineworld

    22 April 2015

    Leader Systems TS have secured orders for new cinemas across the UK during the first 6 months of 2015.
  • Marks and Spencer HQ Waterside Building Paddington London

    23 March 2015

    Leader Systems Special Projects have secured the contract to replace the fire detection at the M&S HQ building in Paddington London and also install a new PAVA system allowing them to implement a ...
  • No1 Blackfriars London

    09 February 2015

    Leader Systems NBI are delighted to have been appointed to deliver life safety systems for the prestigious No 1 Blackfriars project.
  • Leamington Hospital

    05 January 2015

    Leader Systems have secured the order to upgrade the fire detection and alarm system at Leamington Hospital for South Warwickshire NHS Foundation Trust.
  • Leader Systems become a Drax Partner

    19 December 2014

    With electronic life safety and associated systems becoming evermore complicated and the requirement for integration between them evermore important; Leader Systems has signed to partner with industry...
  • Clarges Development London

    19 December 2014

    Leader Systems New Build Installations has secured a £200k contract for the new Clarges combined residential and office block development in the heart of Mayfair. The 193,500ft2 Squire & Partners...
  • Paul Street Students Accommodation

    19 December 2014

    Leader System New Build Installations have secured the £150k contract for a new student’s accommodation project at Paul Street London. The development will include 419 student accommodation rooms and...
  • Tidal Basin London

    19 November 2014

    Leader Systems New Build Installations has secured a £100k contract for the new residential development at Tidal Basin in East London. The Tidal Basin Road scheme is situated to the north west of the...
  • Cineworld Chester and Birmingham NEC

    19 November 2014

    Leader Systems New Build Installations have secured a £150k 2 site contract to design and install Fire Detection and Alarm Systems into the next two Cineworld cinemas. The Cinemas at Broughton and th...
  • Cineworld Swindon

    19 November 2014

    Leader Systems Trade Supplies have secured the design and supply contract for the new Cineworld multi-screen cinema in Swindon. Coming shortly after the completion earlier this year of Cineworld Wemb...
  • Mecure Edinburgh

    19 November 2014

    Leader Systems New Build Installations have secured the £80k contract for the new Mecure Hotel in Edinburgh. Located in 51 countries, the Mercure network brings together mid-range establishments, mai...
  • Abel and Cleland House London

    21 October 2014

    Leader Systems New Build Installations have been awarded a £200k contract for Abel and Cleland House London This is a residential development in the heart of Westminster on a site currently occupied ...
  • Merchant Square Fit Outs

    19 October 2014

    Leader Systems MSP has secured multiple fit out contracts for the prestigious Merchant square project in London valuing £130k. Leader Systems originally installed the £350k landlords Life Safety Syst...
  • Izaak Walton Hotel

    19 October 2014

    Leader Systems Maintenance and Special Projects (MSP) have successfully completed the £30k retrofit installation of a new fire detection and alarm system into the Izaak Walton Hotel in Dovedale. The ...
  • Haria House Bradford

    21 September 2014

    Leader Systems Maintenance and Specialist Projects have successfully completed the retrofit installation of a new £100k fire detection and alarm system in Haria House student’s accommodation in Bradfo...
  • University Of Northampton Innovation Centre

    21 July 2014

    Leader Systems New Build Installations have been awarded the £75k contract for the new University of Northampton Innovation Centre. The Centre is a flagship building for the Northampton Enterprise Zo...

Contact us:

Leader Systems LLP,
Hadrian’s Way,
Glebe Farm Industrial Estate,
Rugby,
Warwickshire
CV21 1ST

Tel: 01788 542220
email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Contact us:

Leader Systems LLP,
Hadrian’s Way,
Glebe Farm Industrial Estate,
Rugby,
Warwickshire
CV21 1ST

Tel: 01788 542220
email: This email address is being protected from spambots. You need JavaScript enabled to view it.